Bid Abstract

0412 - SAP 009-608-014 - Grading, Aggregate Base, Drainage StructuresULLAND BROTHERS Hammerlund Construction, Inc. Veit & Company, Inc. KGM CONTRACTORS INC NORTHLAND CONSTRUCTORS Casper Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$34,723.05$34,723.05$107,953.60$107,953.60$250,000.00$250,000.00$156,000.00$156,000.00$68,000.00$68,000.00$181,240.55$181,240.55
2031.501FIELD OFFICE TYPE DEACH1$4,000.00$4,000.00$6,000.00$6,000.00$4,500.00$4,500.00$9,500.00$9,500.00$7,000.00$7,000.00$2,500.00$2,500.00
2101.501CLEARINGACRE6$1,500.00$9,000.00$1,900.00$11,400.00$4,000.00$24,000.00$3,700.00$22,200.00$6,000.00$36,000.00$4,500.00$27,000.00
2101.506GRUBBINGACRE6$4,000.00$24,000.00$4,500.00$27,000.00$4,700.00$28,200.00$3,700.00$22,200.00$4,000.00$24,000.00$4,150.00$24,900.00
2104.501REMOVE PIPE CULVERTSL F466$11.00$5,126.00$7.50$3,495.00$9.75$4,543.50$9.00$4,194.00$20.00$9,320.00$4.00$1,864.00
2104.513SAWING BITUMINOUS PAVEMENTL F24$7.00$168.00$3.00$72.00$3.50$84.00$3.00$72.00$6.00$144.00$2.00$48.00
2105.501COMMON EXCAVATIONC Y31,627$6.50$205,575.50$4.00$126,508.00$7.50$237,202.50$4.00$126,508.00$7.50$237,202.50$6.50$205,575.50
2105.522SELECT GRANULAR BORROW (CV)C Y15,496$11.50$178,204.00$11.75$182,078.00$9.45$146,437.20$12.60$195,249.60$12.60$195,249.60$12.00$185,952.00
2105.523COMMON BORROW (CV)C Y46,810$5.50$257,455.00$4.95$231,709.50$4.00$187,240.00$7.65$358,096.50$11.30$528,953.00$12.00$561,720.00
2105.601TEMPORARY STREAM DIVERSION SYSTEMLS1$5,000.00$5,000.00$45,000.00$45,000.00$2,662.39$2,662.39$30,000.00$30,000.00$15,300.00$15,300.00$10,000.00$10,000.00
2105.604GEOTEXTILE FABRIC TYPE VIS Y1,100$3.00$3,300.00$3.20$3,520.00$2.00$2,200.00$3.70$4,070.00$3.20$3,520.00$2.25$2,475.00
2123.503MOTOR GRADERHOUR5$150.00$750.00$145.00$725.00$245.00$1,225.00$185.00$925.00$180.00$900.00$155.00$775.00
2131.502CALCIUM CHLORIDE SOLUTIONGAL18,846$1.05$19,788.30$0.80$15,076.80$0.72$13,569.12$1.15$21,672.90$1.10$20,730.60$1.15$21,672.90
2211.501AGGREGATE BASE CLASS 5TON27,553$12.50$344,412.50$11.25$309,971.25$12.75$351,300.75$13.65$376,098.45$15.50$427,071.50$16.50$454,624.50
2412.5118X8 PRECAST CONCRETE BOX CULVERTL F118$600.00$70,800.00$770.00$90,860.00$640.00$75,520.00$680.00$80,240.00$710.00$83,780.00$730.00$86,140.00
2412.5128X8 PRECAST CONCRETE BOX CULV END SECTEACH2$9,000.00$18,000.00$10,000.00$20,000.00$16,100.00$32,200.00$8,800.00$17,600.00$11,200.00$22,400.00$11,750.00$23,500.00
2451.507GRANULAR BEDDING (CV)C Y472$11.00$5,192.00$20.00$9,440.00$10.70$5,050.40$20.00$9,440.00$23.00$10,856.00$18.50$8,732.00
2451.509AGGREGATE BEDDING (CV)C Y240$31.00$7,440.00$60.00$14,400.00$26.20$6,288.00$31.00$7,440.00$39.00$9,360.00$33.50$8,040.00
2501.51115" CS PIPE CULVERTL F444$22.00$9,768.00$23.00$10,212.00$24.00$10,656.00$38.00$16,872.00$25.00$11,100.00$28.25$12,543.00
2501.51136" RC PIPE CULVERTL F166$63.00$10,458.00$66.00$10,956.00$82.50$13,695.00$120.00$19,920.00$115.00$19,090.00$125.50$20,833.00
2501.51142" RC PIPE CULVERTL F86$85.00$7,310.00$86.00$7,396.00$102.00$8,772.00$165.00$14,190.00$170.00$14,620.00$92.00$7,912.00
2501.51124" RC PIPE CULVERTL F78$45.00$3,510.00$44.00$3,432.00$61.50$4,797.00$70.00$5,460.00$70.00$5,460.00$53.50$4,173.00
2501.51118" CS PIPE CULVERTL F150$23.00$3,450.00$26.00$3,900.00$26.00$3,900.00$45.00$6,750.00$27.00$4,050.00$30.75$4,612.50
2501.51515" GS PIPE APRONEACH18$200.00$3,600.00$110.00$1,980.00$225.00$4,050.00$250.00$4,500.00$180.00$3,240.00$140.00$2,520.00
2501.51524" RC PIPE APRONEACH2$500.00$1,000.00$575.00$1,150.00$750.00$1,500.00$585.00$1,170.00$1,000.00$2,000.00$625.00$1,250.00
2501.51518" GS PIPE APRONEACH6$250.00$1,500.00$120.00$720.00$250.00$1,500.00$265.00$1,590.00$190.00$1,140.00$155.00$930.00
2501.51542" RC PIPE APRONEACH2$950.00$1,900.00$1,150.00$2,300.00$1,375.00$2,750.00$1,350.00$2,700.00$2,600.00$5,200.00$1,295.00$2,590.00
2501.51536" RC PIPE APRONEACH4$800.00$3,200.00$925.00$3,700.00$1,225.00$4,900.00$1,000.00$4,000.00$2,000.00$8,000.00$1,045.00$4,180.00
2501.52128" SPAN RC PIPE-ARCH CULV CL IIAL F102$68.00$6,936.00$78.00$7,956.00$69.00$7,038.00$105.00$10,710.00$115.00$11,730.00$78.75$8,032.50
2501.52528" SPAN RC PIPE-ARCH APRONEACH4$500.00$2,000.00$650.00$2,600.00$725.00$2,900.00$585.00$2,340.00$1,000.00$4,000.00$650.00$2,600.00
2511.501RANDOM RIPRAP CLASS SPECIALC Y20$95.00$1,900.00$75.00$1,500.00$217.00$4,340.00$100.00$2,000.00$145.00$2,900.00$70.25$1,405.00
2511.501RANDOM RIPRAP CLASS IIC Y64$170.00$10,880.00$105.00$6,720.00$67.50$4,320.00$100.00$6,400.00$98.00$6,272.00$70.25$4,496.00
2511.501RANDOM RIPRAP CLASS IIIC Y130$65.00$8,450.00$60.00$7,800.00$78.80$10,244.00$75.00$9,750.00$70.00$9,100.00$70.25$9,132.50
2563.601TRAFFIC CONTROLLS1$5,800.00$5,800.00$13,000.00$13,000.00$12,200.00$12,200.00$13,000.00$13,000.00$7,000.00$7,000.00$6,760.00$6,760.00
2563.601TRAFFIC CONTROL SUPERVISORLS1$2,500.00$2,500.00$2,500.00$2,500.00$45,500.00$45,500.00$1,750.00$1,750.00$500.00$500.00$3,875.00$3,875.00
2573.502SILT FENCE, TYPE MSL F12,016$1.90$22,830.40$1.90$22,830.40$1.90$22,830.40$2.00$24,032.00$2.05$24,632.80$2.25$27,036.00
2573.520SEDIMENT REMOVAL BACKHOEHOUR40$170.00$6,800.00$145.00$5,800.00$220.00$8,800.00$175.00$7,000.00$200.00$8,000.00$227.00$9,080.00
2573.533SEDIMENT CONTROL LOG TYPE COMPOSTL F2,232$3.75$8,370.00$3.75$8,370.00$3.35$7,477.20$3.95$8,816.40$4.00$8,928.00$4.40$9,820.80
2573.533SEDIMENT CONTROL LOG TYPE ROCKL F1,104$5.95$6,568.80$6.00$6,624.00$6.75$7,452.00$6.25$6,900.00$6.20$6,844.80$7.00$7,728.00
2573.550EROSION CONTROL SUPERVISORLS1$1,700.00$1,700.00$5,000.00$5,000.00$6,150.00$6,150.00$2,300.00$2,300.00$500.00$500.00$4,875.00$4,875.00
2573.560CULVERT END CONTROLSEACH36$130.00$4,680.00$125.00$4,500.00$150.00$5,400.00$195.00$7,020.00$140.00$5,040.00$152.00$5,472.00
2575.501SEEDINGACRE15$60.00$900.00$60.00$900.00$575.00$8,625.00$63.00$945.00$63.00$945.00$70.00$1,050.00
2575.502SEED MIXTURE 25-141LB885$4.40$3,894.00$4.40$3,894.00$3.35$2,964.75$4.65$4,115.25$4.60$4,071.00$5.15$4,557.75
2575.511MULCH MATERIAL TYPE 1TON30$220.00$6,600.00$220.00$6,600.00$255.00$7,650.00$231.00$6,930.00$230.00$6,900.00$257.00$7,710.00
2575.519DISK ANCHORINGACRE13$55.00$715.00$55.00$715.00$105.00$1,365.00$58.00$754.00$58.00$754.00$64.50$838.50
2575.523EROSION CONTROL BLANKETS CATEGORY 3S Y2,982$1.00$2,982.00$1.00$2,982.00$1.15$3,429.30$1.05$3,131.10$1.05$3,131.10$1.15$3,429.30
2575.572RAPID STABILIZATION METHOD 4S Y27,961$1.45$40,543.45$1.45$40,543.45$1.45$40,543.45$1.50$41,941.50$1.50$41,941.50$1.70$47,533.70
 Totals for project 0412 $1,383,680.00 $1,401,790.00 $1,637,971.96 $1,678,493.70 $1,926,877.40 $2,033,735.00
 
Contract Total:$1,383,680.00$1,401,790.00$1,637,971.96$1,678,493.70$1,926,877.40$2,033,735.00