1513 - 009-149-003 CR 149 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGS | KGM CONTRACTORS INC | Scott Construction, Inc. | Asphalt Surface Technologies Corp. |
Item No. | Item | Units | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price |
2021.501 | MOBILIZATION | LS | 1 | $1,100.00 | $1,100.00 | $2,000.00 | $2,000.00 | $1,000.00 | $1,000.00 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GAL | 1,240 | $1.80 | $2,232.00 | $2.19 | $2,715.60 | $2.50 | $3,100.00 |
2356.604 | BITUMINOUS SEAL COAT - SCRUB SEAL | SQ YD | 10,333 | $0.92 | $9,506.36 | $0.75 | $7,749.75 | $1.03 | $10,642.99 |
2356.606 | BITUMINOUS MATERIAL FOR SCRUB SEAL | GALLON | 3,453 | $2.75 | $9,495.75 | $3.64 | $12,568.92 | $2.68 | $9,254.04 |
2563.601 | TRAFFIC CONTROL SUPERVISOR | LS | 1 | $400.00 | $400.00 | $750.00 | $750.00 | $1,000.00 | $1,000.00 |
2563.601 | TRAFFIC CONTROL | LS | 1 | $840.00 | $840.00 | $550.00 | $550.00 | $1,000.00 | $1,000.00 |
2580.503 | INTERIM PAVEMENT MARKING | L F | 6,742 | $0.09 | $606.78 | $0.14 | $943.88 | $0.12 | $809.04 |
2582.503 | 4" SOLID LINE MULTI COMP | L F | 2,778 | $0.28 | $777.84 | $0.27 | $750.06 | $0.27 | $750.06 |
2582.503 | 4" BROKEN LINE MULTI COMP | L F | 593 | $0.28 | $166.04 | $0.27 | $160.11 | $0.27 | $160.11 |
2582.503 | 6" SOLID LINE MULTI COMP CONT | L F | 7,750 | $0.38 | $2,945.00 | $0.36 | $2,790.00 | $0.36 | $2,790.00 |
2582.503 | 4" BROKEN LINE MULTI COMP GR IN (WR) | L F | 593 | $0.65 | $385.45 | $0.62 | $367.66 | $0.67 | $397.31 |
2582.503 | 4" SOLID LINE MULTI COMP GR IN (WR) | L F | 2,778 | $0.65 | $1,805.70 | $0.62 | $1,722.36 | $0.67 | $1,861.26 |
2582.503 | 6" SOLID LINE MULTI COMP GR IN (WR) | L F | 7,750 | $0.86 | $6,665.00 | $0.82 | $6,355.00 | $0.92 | $7,130.00 |
| Totals for project 1513 | | $36,925.92 | | $39,423.34 | | $39,894.81 |
|
1808 - SAP 009-645-006 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGS | KGM CONTRACTORS INC | Scott Construction, Inc. | Asphalt Surface Technologies Corp. |
Item No. | Item | Units | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price |
2021.501 | MOBILIZATION | LS | 1 | $5,100.00 | $5,100.00 | $2,000.00 | $2,000.00 | $3,400.00 | $3,400.00 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GAL | 3,697 | $1.70 | $6,284.90 | $2.19 | $8,096.43 | $2.50 | $9,242.50 |
2356.604 | BITUMINOUS SEAL COAT - SCRUB SEAL | SQ YD | 30,810 | $0.89 | $27,420.90 | $0.75 | $23,107.50 | $1.03 | $31,734.30 |
2356.606 | BITUMINOUS MATERIAL FOR SCRUB SEAL | GALLON | 10,233 | $2.75 | $28,140.75 | $3.64 | $37,248.12 | $2.68 | $27,424.44 |
2554.502 | END TREATMENT-TANGENT TERMINAL | EACH | 3 | $4,500.00 | $13,500.00 | $5,000.00 | $15,000.00 | $5,000.00 | $15,000.00 |
2563.601 | TRAFFIC CONTROL SUPERVISOR | LS | 1 | $400.00 | $400.00 | $750.00 | $750.00 | $1,000.00 | $1,000.00 |
2563.601 | TRAFFIC CONTROL | LS | 1 | $840.00 | $840.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
2564.518 | SIGN PANELS TYPE C | S F | 33 | $57.75 | $1,905.75 | $100.00 | $3,300.00 | $60.00 | $1,980.00 |
2580.503 | INTERIM PAVEMENT MARKING | L F | 20,500 | $0.09 | $1,845.00 | $0.14 | $2,870.00 | $0.12 | $2,460.00 |
2582.503 | 4" SOLID LINE MULTI COMP | L F | 9,274 | $0.28 | $2,596.72 | $0.27 | $2,503.98 | $0.27 | $2,503.98 |
2582.503 | 4" BROKEN LINE MULTI COMP | L F | 976 | $0.28 | $273.28 | $0.27 | $263.52 | $0.27 | $263.52 |
2582.503 | 6" SOLID LINE MULTI COMP | L F | 9,128 | $0.38 | $3,468.64 | $0.36 | $3,286.08 | $0.36 | $3,286.08 |
2582.503 | 24" SOLID LINE MULTI COMP | L F | 570 | $10.00 | $5,700.00 | $9.50 | $5,415.00 | $8.20 | $4,674.00 |
2582.503 | 4" SOLID LINE MULTI COMP GR IN (WR) | L F | 9,274 | $0.65 | $6,028.10 | $0.62 | $5,749.88 | $0.67 | $6,213.58 |
2582.503 | 4" BROKEN LINE MULTI COMP GR IN (WR) | L F | 976 | $0.65 | $634.40 | $0.62 | $605.12 | $0.67 | $653.92 |
2582.503 | 6" SOLID LINE MULTI COMP GR IN (WR) | L F | 9,128 | $0.86 | $7,850.08 | $0.82 | $7,484.96 | $0.92 | $8,397.76 |
2582.503 | 24" SOLID LINE MULTI COMP GR IN (WR) | L F | 570 | $14.70 | $8,379.00 | $14.00 | $7,980.00 | $17.60 | $10,032.00 |
2582.518 | CROSSWALK MULTI COMP | S F | 216 | $13.65 | $2,948.40 | $13.00 | $2,808.00 | $6.60 | $1,425.60 |
2582.518 | PAVT MSSG MULTI COMP | S F | 894 | $14.15 | $12,650.10 | $13.50 | $12,069.00 | $9.20 | $8,224.80 |
2582.518 | CROSSWALK MULTI COMP GR IN (WR) | S F | 216 | $17.35 | $3,747.60 | $16.50 | $3,564.00 | $11.00 | $2,376.00 |
2582.518 | PAVT MSSG MULTI COMP GR IN (WR) | S F | 894 | $20.50 | $18,327.00 | $19.50 | $17,433.00 | $16.50 | $14,751.00 |
| Totals for project 1808 | | $158,040.62 | | $162,534.59 | | $156,043.48 |
|
1503 - SAP 009-607-025 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGS | KGM CONTRACTORS INC | Scott Construction, Inc. | Asphalt Surface Technologies Corp. |
Item No. | Item | Units | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price |
2021.501 | MOBILIZATION | LS | 1 | $16,500.00 | $16,500.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GAL | 2,563 | $1.75 | $4,485.25 | $2.19 | $5,612.97 | $2.50 | $6,407.50 |
2356.604 | BITUMINOUS SEAL COAT - SCRUB SEAL | SQ YD | 21,354 | $0.70 | $14,947.80 | $0.75 | $16,015.50 | $1.03 | $21,994.62 |
2356.606 | BITUMINOUS MATERIAL FOR SCRUB SEAL | GALLON | 7,096 | $2.75 | $19,514.00 | $3.64 | $25,829.44 | $2.69 | $19,088.24 |
2563.601 | TRAFFIC CONTROL SUPERVISOR | LS | 1 | $390.00 | $390.00 | $750.00 | $750.00 | $1,000.00 | $1,000.00 |
2563.601 | TRAFFIC CONTROL | LS | 1 | $1,050.00 | $1,050.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
2580.503 | INTERIM PAVEMENT MARKING | L F | 12,910 | $0.09 | $1,161.90 | $0.14 | $1,807.40 | $0.12 | $1,549.20 |
2582.503 | 4" SOLID LINE MULTI COMP | L F | 6,062 | $0.28 | $1,697.36 | $0.27 | $1,636.74 | $0.27 | $1,636.74 |
2582.503 | 4" BROKEN LINE MULTI COMP | L F | 393 | $0.28 | $110.04 | $0.27 | $106.11 | $0.27 | $106.11 |
2582.503 | 6" SOLID LINE MULTI COMP | L F | 8,928 | $0.38 | $3,392.64 | $0.36 | $3,214.08 | $0.36 | $3,214.08 |
2582.503 | 24" SOLID LINE MULTI COMP | L F | 119 | $10.00 | $1,190.00 | $9.50 | $1,130.50 | $8.20 | $975.80 |
2582.503 | 4" SOLID LINE MULTI COMP GR IN (WR) | L F | 6,062 | $0.65 | $3,940.30 | $0.62 | $3,758.44 | $0.67 | $4,061.54 |
2582.503 | 6" SOLID LINE MULTI COMP GR IN (WR) | L F | 8,928 | $0.86 | $7,678.08 | $0.82 | $7,320.96 | $0.92 | $8,213.76 |
2582.503 | 4" BROKEN LINE MULTI COMP GR IN (WR) | L F | 393 | $0.65 | $255.45 | $0.62 | $243.66 | $0.67 | $263.31 |
2582.503 | 24" SOLID LINE MULTI COMP GR IN (WR) | L F | 119 | $15.00 | $1,785.00 | $14.00 | $1,666.00 | $17.60 | $2,094.40 |
| Totals for project 1503 | | $78,097.82 | | $72,591.80 | | $74,105.30 |
|
1807 - SAP 009-620-009 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGS | KGM CONTRACTORS INC | Scott Construction, Inc. | Asphalt Surface Technologies Corp. |
Item No. | Item | Units | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price |
2021.501 | MOBILIZATION | LS | 1 | $1,100.00 | $1,100.00 | $2,000.00 | $2,000.00 | $1,000.00 | $1,000.00 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GAL | 817 | $1.70 | $1,388.90 | $2.19 | $1,789.23 | $2.50 | $2,042.50 |
2356.604 | BITUMINOUS SEAL COAT - SCRUB SEAL | SQ YD | 6,810 | $1.05 | $7,150.50 | $0.75 | $5,107.50 | $1.03 | $7,014.30 |
2356.606 | BITUMINOUS MATERIAL FOR SCRUB SEAL | GALLON | 2,278 | $2.75 | $6,264.50 | $3.64 | $8,291.92 | $2.69 | $6,127.82 |
2563.601 | TRAFFIC CONTROL SUPERVISOR | LS | 1 | $400.00 | $400.00 | $750.00 | $750.00 | $1,000.00 | $1,000.00 |
2563.601 | TRAFFIC CONTROL | LS | 1 | $840.00 | $840.00 | $1,100.00 | $1,100.00 | $1,000.00 | $1,000.00 |
2580.503 | INTERIM PAVEMENT MARKING | L F | 2,678 | $0.15 | $401.70 | $0.14 | $374.92 | $0.12 | $321.36 |
2582.503 | 4" SOLID LINE MULTI COMP | L F | 801 | $0.28 | $224.28 | $0.27 | $216.27 | $0.27 | $216.27 |
2582.503 | 4" BROKEN LINE MULTI COMP | L F | 538 | $0.28 | $150.64 | $0.27 | $145.26 | $0.27 | $145.26 |
2582.503 | 4" SOLID LINE MULTI COMP GR IN (WR) | L F | 801 | $0.65 | $520.65 | $0.62 | $496.62 | $0.67 | $536.67 |
2582.503 | 4" BROKEN LINE MULTI COMP GR IN (WR) | L F | 538 | $0.65 | $349.70 | $0.62 | $333.56 | $0.67 | $360.46 |
| Totals for project 1807 | | $18,790.87 | | $20,605.28 | | $19,764.64 |
|
1506 - SAP 009-622-006 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGS | KGM CONTRACTORS INC | Scott Construction, Inc. | Asphalt Surface Technologies Corp. |
Item No. | Item | Units | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price |
2021.501 | MOBILIZATION | LS | 1 | $1,100.00 | $1,100.00 | $2,000.00 | $2,000.00 | $12,000.00 | $12,000.00 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GAL | 16,037 | $1.70 | $27,262.90 | $2.19 | $35,121.03 | $2.50 | $40,092.50 |
2356.604 | BITUMINOUS SEAL COAT - SCRUB SEAL | SQ YD | 133,642 | $0.85 | $113,595.70 | $0.75 | $100,231.50 | $1.03 | $137,651.26 |
2356.606 | BITUMINOUS MATERIAL FOR SCRUB SEAL | GALLON | 44,659 | $2.75 | $122,812.25 | $3.64 | $162,558.76 | $2.68 | $119,686.12 |
2563.601 | TRAFFIC CONTROL SUPERVISOR | LS | 1 | $400.00 | $400.00 | $750.00 | $750.00 | $1,000.00 | $1,000.00 |
2563.601 | TRAFFIC CONTROL | LS | 1 | $1,680.00 | $1,680.00 | $2,300.00 | $2,300.00 | $2,000.00 | $2,000.00 |
2580.503 | INTERIM PAVEMENT MARKING | L F | 103,812 | $0.09 | $9,343.08 | $0.14 | $14,533.68 | $0.12 | $12,457.44 |
2582.503 | 4" SOLID LINE MULTI COMP | L F | 44,483 | $0.28 | $12,455.24 | $0.27 | $12,010.41 | $0.27 | $12,010.41 |
2582.503 | 4" BROKEN LINE MULTI COMP | L F | 7,423 | $0.28 | $2,078.44 | $0.27 | $2,004.21 | $0.27 | $2,004.21 |
2582.503 | 6" SOLID LINE MULTI COMP | L F | 100,232 | $0.38 | $38,088.16 | $0.36 | $36,083.52 | $0.36 | $36,083.52 |
2582.503 | 4" SOLID LINE MULTI COMP GR IN (WR) | L F | 44,483 | $0.65 | $28,913.95 | $0.62 | $27,579.46 | $0.67 | $29,803.61 |
2582.503 | 4" BROKEN LINE MULTI COMP GR IN (WR) | L F | 7,423 | $0.65 | $4,824.95 | $0.62 | $4,602.26 | $0.67 | $4,973.41 |
2582.503 | 6" SOLID LINE MULTI COMP GR IN (WR) | L F | 100,232 | $0.86 | $86,199.52 | $0.82 | $82,190.24 | $0.92 | $92,213.44 |
| Totals for project 1506 | | $448,754.19 | | $481,965.07 | | $501,975.92 |
|
1809 - SAP 009-661-029 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGS | KGM CONTRACTORS INC | Scott Construction, Inc. | Asphalt Surface Technologies Corp. |
Item No. | Item | Units | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price |
2021.501 | MOBILIZATION | LS | 0.71 | $4,200.00 | $2,982.00 | $2,000.00 | $1,420.00 | $2,300.00 | $1,633.00 |
2021.501 | MOBILIZATION | LS | 0.29 | $4,200.00 | $1,218.00 | $2,000.00 | $580.00 | $2,300.00 | $667.00 |
2232.603 | MILLED RUMBLE STRIPS | L F | 430 | $15.75 | $6,772.50 | $27.90 | $11,997.00 | $38.00 | $16,340.00 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GAL | 1,911 | $1.70 | $3,248.70 | $2.19 | $4,185.09 | $2.50 | $4,777.50 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GAL | 885 | $1.70 | $1,504.50 | $2.19 | $1,938.15 | $2.50 | $2,212.50 |
2356.604 | BITUMINOUS SEAL COAT - SCRUB SEAL | SQ YD | 15,924 | $0.85 | $13,535.40 | $0.75 | $11,943.00 | $1.03 | $16,401.72 |
2356.604 | BITUMINOUS SEAL COAT - SCRUB SEAL | SQ YD | 7,373 | $0.85 | $6,267.05 | $0.75 | $5,529.75 | $1.03 | $7,594.19 |
2356.606 | BITUMINOUS MATERIAL FOR SCRUB SEAL | GALLON | 5,288 | $2.75 | $14,542.00 | $3.64 | $19,248.32 | $2.68 | $14,171.84 |
2356.606 | BITUMINOUS MATERIAL FOR SCRUB SEAL | GALLON | 2,448 | $2.75 | $6,732.00 | $3.64 | $8,910.72 | $2.68 | $6,560.64 |
2563.601 | TRAFFIC CONTROL SUPERVISOR | LS | 0.71 | $400.00 | $284.00 | $750.00 | $532.50 | $1,000.00 | $710.00 |
2563.601 | TRAFFIC CONTROL SUPERVISOR | LS | 0.29 | $400.00 | $116.00 | $750.00 | $217.50 | $1,000.00 | $290.00 |
2563.601 | TRAFFIC CONTROL | LS | 0.71 | $840.00 | $596.40 | $650.00 | $461.50 | $1,000.00 | $710.00 |
2563.601 | TRAFFIC CONTROL | LS | 0.29 | $840.00 | $243.60 | $650.00 | $188.50 | $1,000.00 | $290.00 |
2580.503 | INTERIM PAVEMENT MARKING | L F | 8,738 | $0.09 | $786.42 | $0.14 | $1,223.32 | $0.12 | $1,048.56 |
2580.503 | INTERIM PAVEMENT MARKING | L F | 7,442 | $0.09 | $669.78 | $0.14 | $1,041.88 | $0.12 | $893.04 |
2582.503 | 4" SOLID LINE MULTI COMP | L F | 3,956 | $0.28 | $1,107.68 | $0.27 | $1,068.12 | $0.27 | $1,068.12 |
2582.503 | 4" SOLID LINE MULTI COMP | L F | 3,123 | $0.28 | $874.44 | $0.27 | $843.21 | $0.27 | $843.21 |
2582.503 | 4" BROKEN LINE MULTI COMP | L F | 413 | $0.28 | $115.64 | $0.27 | $111.51 | $0.27 | $111.51 |
2582.503 | 6" SOLID LINE MULTI COMP | L F | 6,016 | $0.38 | $2,286.08 | $0.36 | $2,165.76 | $0.36 | $2,165.76 |
2582.503 | 6" SOLID LINE MULTI COMP | L F | 2,735 | $0.38 | $1,039.30 | $0.36 | $984.60 | $0.36 | $984.60 |
2582.503 | 6" DOTTED LINE MULTI COMP | LF | 39 | $0.38 | $14.82 | $0.36 | $14.04 | $0.36 | $14.04 |
2582.503 | 4" SOLID LINE MULTI COMP GR IN (WR) | L F | 3,956 | $0.65 | $2,571.40 | $0.62 | $2,452.72 | $0.67 | $2,650.52 |
2582.503 | 4" SOLID LINE MULTI COMP GR IN (WR) | L F | 3,123 | $0.65 | $2,029.95 | $0.62 | $1,936.26 | $0.67 | $2,092.41 |
2582.503 | 4" BROKEN LINE MULTI COMP GR IN (WR) | L F | 413 | $0.65 | $268.45 | $0.62 | $256.06 | $0.67 | $276.71 |
2582.503 | 6" SOLID LINE MULTI COMP GR IN (WR) | L F | 6,016 | $0.86 | $5,173.76 | $0.82 | $4,933.12 | $0.92 | $5,534.72 |
2582.503 | 6" SOLID LINE MULTI COMP GR IN (WR) | L F | 2,735 | $0.86 | $2,352.10 | $0.82 | $2,242.70 | $0.92 | $2,516.20 |
2582.503 | 6" DOTTED LINE MULTI COMP GR IN (WR) | L F | 39 | $0.86 | $33.54 | $0.82 | $31.98 | $0.92 | $35.88 |
| Totals for project 1809 | | $77,365.51 | | $86,457.31 | | $92,593.67 |
|
1911 - T.L.T. 2019-01 EAST CHUB LK RD BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGS | KGM CONTRACTORS INC | Scott Construction, Inc. | Asphalt Surface Technologies Corp. |
Item No. | Item | Units | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price |
2021.501 | MOBILIZATION | LS | 1 | $1,100.00 | $1,100.00 | $2,000.00 | $2,000.00 | $3,100.00 | $3,100.00 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GAL | 3,884 | $1.85 | $7,185.40 | $2.19 | $8,505.96 | $2.50 | $9,710.00 |
2356.604 | BITUMINOUS SEAL COAT - SCRUB SEAL | SQ YD | 32,369 | $0.65 | $21,039.85 | $0.75 | $24,276.75 | $1.03 | $33,340.07 |
2356.606 | BITUMINOUS MATERIAL FOR SCRUB SEAL | GALLON | 10,822 | $2.70 | $29,219.40 | $3.64 | $39,392.08 | $2.68 | $29,002.96 |
2563.601 | TRAFFIC CONTROL SUPERVISOR | LS | 1 | $400.00 | $400.00 | $750.00 | $750.00 | $1,000.00 | $1,000.00 |
2563.601 | TRAFFIC CONTROL | LS | 1 | $525.00 | $525.00 | $1,200.00 | $1,200.00 | $1,000.00 | $1,000.00 |
2580.503 | INTERIM PAVEMENT MARKING | L F | 47,096 | $0.09 | $4,238.64 | $0.14 | $6,593.44 | $0.12 | $5,651.52 |
2582.503 | 4" SOLID LINE MULTI COMP | L F | 23,196 | $0.28 | $6,494.88 | $0.27 | $6,262.92 | $0.27 | $6,262.92 |
2582.503 | 4" BROKEN LINE MULTI COMP | L F | 352 | $0.28 | $98.56 | $0.27 | $95.04 | $0.27 | $95.04 |
2582.503 | 6" SOLID LINE MULTI COMP | L F | 25,288 | $0.38 | $9,609.44 | $0.36 | $9,103.68 | $0.36 | $9,103.68 |
2582.503 | 4" SOLID LINE MULTI COMP GR IN (WR) | L F | 23,196 | $0.65 | $15,077.40 | $0.62 | $14,381.52 | $0.67 | $15,541.32 |
2582.503 | 4" BROKEN LINE MULTI COMP GR IN (WR) | L F | 352 | $0.65 | $228.80 | $0.62 | $218.24 | $0.67 | $235.84 |
2582.503 | 6" SOLID LINE MULTI COMP GR IN (WR) | L F | 25,288 | $0.86 | $21,747.68 | $0.82 | $20,736.16 | $0.92 | $23,264.96 |
| Totals for project 1911 | | $116,965.05 | | $133,515.79 | | $137,308.31 |
|
1912 - T.L.T. 2019-02 JAY WEST RD BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGS | KGM CONTRACTORS INC | Scott Construction, Inc. | Asphalt Surface Technologies Corp. |
Item No. | Item | Units | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price |
2021.501 | MOBILIZATION | LS | 1 | $1,100.00 | $1,100.00 | $2,000.00 | $2,000.00 | $2,400.00 | $2,400.00 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GAL | 2,813 | $1.70 | $4,782.10 | $2.19 | $6,160.47 | $2.50 | $7,032.50 |
2356.604 | BITUMINOUS SEAL COAT - SCRUB SEAL | SQ YD | 23,442 | $0.84 | $19,691.28 | $0.75 | $17,581.50 | $1.03 | $24,145.26 |
2356.606 | BITUMINOUS MATERIAL FOR SCRUB SEAL | GALLON | 7,842 | $2.75 | $21,565.50 | $3.64 | $28,544.88 | $2.68 | $21,016.56 |
2563.601 | TRAFFIC CONTROL SUPERVISOR | LS | 1 | $400.00 | $400.00 | $750.00 | $750.00 | $1,000.00 | $1,000.00 |
2563.601 | TRAFFIC CONTROL | LS | 1 | $525.00 | $525.00 | $900.00 | $900.00 | $1,000.00 | $1,000.00 |
2580.503 | INTERIM PAVEMENT MARKING | L F | 25,662 | $0.09 | $2,309.58 | $0.14 | $3,592.68 | $0.12 | $3,079.44 |
2582.503 | 4" SOLID LINE MULTI COMP | L F | 11,641 | $0.28 | $3,259.48 | $0.27 | $3,143.07 | $0.27 | $3,143.07 |
2582.503 | 6" SOLID LINE MULTI COMP | L F | 19,180 | $0.38 | $7,288.40 | $0.36 | $6,904.80 | $0.36 | $6,904.80 |
2582.503 | 4" BROKEN LINE MULTI COMP | L F | 1,190 | $0.28 | $333.20 | $0.27 | $321.30 | $0.27 | $321.30 |
2582.503 | 4" SOLID LINE MULTI COMP GR IN (WR) | L F | 11,641 | $0.65 | $7,566.65 | $0.62 | $7,217.42 | $0.67 | $7,799.47 |
2582.503 | 6" SOLID LINE MULTI COMP GR IN (WR) | L F | 19,180 | $0.86 | $16,494.80 | $0.82 | $15,727.60 | $0.36 | $6,904.80 |
2582.503 | 4" BROKEN LINE MULTI COMP GR IN (WR) | L F | 1,190 | $0.65 | $773.50 | $0.62 | $737.80 | $0.67 | $797.30 |
| Totals for project 1912 | | $86,089.49 | | $93,581.52 | | $85,544.50 |
|
1913 - T.L.T. 2019-03 WEST CHUB LK RD BITUM SEALCOAT/SCRUB SEAL/FOG SEAL | KGM CONTRACTORS INC | Scott Construction, Inc. | Asphalt Surface Technologies Corp. |
Item No. | Item | Units | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price |
2021.501 | MOBILIZATION | LS | 1 | $1,100.00 | $1,100.00 | $2,000.00 | $2,000.00 | $3,100.00 | $3,100.00 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GAL | 4,065 | $1.80 | $7,317.00 | $2.19 | $8,902.35 | $2.50 | $10,162.50 |
2356.604 | BITUMINOUS SEAL COAT - SCRUB SEAL | SQ YD | 33,873 | $0.84 | $28,453.32 | $0.75 | $25,404.75 | $1.03 | $34,889.19 |
2356.606 | BITUMINOUS MATERIAL FOR SCRUB SEAL | GALLON | 11,332 | $2.70 | $30,596.40 | $3.64 | $41,248.48 | $2.68 | $30,369.76 |
2563.601 | TRAFFIC CONTROL SUPERVISOR | LS | 1 | $400.00 | $400.00 | $750.00 | $750.00 | $1,000.00 | $1,000.00 |
2563.601 | TRAFFIC CONTROL | LS | 1 | $105.00 | $105.00 | $800.00 | $800.00 | $1,000.00 | $1,000.00 |
2580.503 | INTERIM PAVEMENT MARKING | L F | 48,420 | $0.09 | $4,357.80 | $0.14 | $6,778.80 | $0.12 | $5,810.40 |
2582.503 | 4" SOLID LINE MULTI COMP | L F | 23,557 | $0.28 | $6,595.96 | $0.27 | $6,360.39 | $0.27 | $6,360.39 |
2582.503 | 6" SOLID LINE MULTI COMP | L F | 27,714 | $0.38 | $10,531.32 | $0.36 | $9,977.04 | $0.36 | $9,977.04 |
2582.503 | 4" BROKEN LINE MULTI COMP | L F | 653 | $0.28 | $182.84 | $0.27 | $176.31 | $0.27 | $176.31 |
2582.503 | 4" SOLID LINE MULTI COMP GR IN (WR) | L F | 23,557 | $0.65 | $15,312.05 | $0.62 | $14,605.34 | $0.67 | $15,783.19 |
2582.503 | 6" SOLID LINE MULTI COMP GR IN (WR) | L F | 27,714 | $0.86 | $23,834.04 | $0.82 | $22,725.48 | $0.92 | $25,496.88 |
2582.503 | 4" BROKEN LINE MULTI COMP GR IN (WR) | L F | 653 | $0.65 | $424.45 | $0.62 | $404.86 | $0.92 | $600.76 |
| Totals for project 1913 | | $129,210.18 | | $140,133.80 | | $144,726.42 |
|
Contract Total: | $1,150,239.65 | $1,230,808.50 | $1,251,957.05 |