Contract Bid Abstract

1513 - 009-149-003 CR 149 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGSKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$1,100.00$1,100.00$2,000.00$2,000.00$1,000.00$1,000.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL1,240$1.80$2,232.00$2.19$2,715.60$2.50$3,100.00
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD10,333$0.92$9,506.36$0.75$7,749.75$1.03$10,642.99
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON3,453$2.75$9,495.75$3.64$12,568.92$2.68$9,254.04
2563.601TRAFFIC CONTROL SUPERVISORLS1$400.00$400.00$750.00$750.00$1,000.00$1,000.00
2563.601TRAFFIC CONTROLLS1$840.00$840.00$550.00$550.00$1,000.00$1,000.00
2580.503INTERIM PAVEMENT MARKINGL F6,742$0.09$606.78$0.14$943.88$0.12$809.04
2582.5034" SOLID LINE MULTI COMPL F2,778$0.28$777.84$0.27$750.06$0.27$750.06
2582.5034" BROKEN LINE MULTI COMPL F593$0.28$166.04$0.27$160.11$0.27$160.11
2582.5036" SOLID LINE MULTI COMP CONTL F7,750$0.38$2,945.00$0.36$2,790.00$0.36$2,790.00
2582.5034" BROKEN LINE MULTI COMP GR IN (WR)L F593$0.65$385.45$0.62$367.66$0.67$397.31
2582.5034" SOLID LINE MULTI COMP GR IN (WR)L F2,778$0.65$1,805.70$0.62$1,722.36$0.67$1,861.26
2582.5036" SOLID LINE MULTI COMP GR IN (WR)L F7,750$0.86$6,665.00$0.82$6,355.00$0.92$7,130.00
 Totals for project 1513 $36,925.92 $39,423.34 $39,894.81
 
1808 - SAP 009-645-006 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGSKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$5,100.00$5,100.00$2,000.00$2,000.00$3,400.00$3,400.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL3,697$1.70$6,284.90$2.19$8,096.43$2.50$9,242.50
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD30,810$0.89$27,420.90$0.75$23,107.50$1.03$31,734.30
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON10,233$2.75$28,140.75$3.64$37,248.12$2.68$27,424.44
2554.502END TREATMENT-TANGENT TERMINALEACH3$4,500.00$13,500.00$5,000.00$15,000.00$5,000.00$15,000.00
2563.601TRAFFIC CONTROL SUPERVISORLS1$400.00$400.00$750.00$750.00$1,000.00$1,000.00
2563.601TRAFFIC CONTROLLS1$840.00$840.00$1,000.00$1,000.00$1,000.00$1,000.00
2564.518SIGN PANELS TYPE CS F33$57.75$1,905.75$100.00$3,300.00$60.00$1,980.00
2580.503INTERIM PAVEMENT MARKINGL F20,500$0.09$1,845.00$0.14$2,870.00$0.12$2,460.00
2582.5034" SOLID LINE MULTI COMPL F9,274$0.28$2,596.72$0.27$2,503.98$0.27$2,503.98
2582.5034" BROKEN LINE MULTI COMPL F976$0.28$273.28$0.27$263.52$0.27$263.52
2582.5036" SOLID LINE MULTI COMPL F9,128$0.38$3,468.64$0.36$3,286.08$0.36$3,286.08
2582.50324" SOLID LINE MULTI COMPL F570$10.00$5,700.00$9.50$5,415.00$8.20$4,674.00
2582.5034" SOLID LINE MULTI COMP GR IN (WR)L F9,274$0.65$6,028.10$0.62$5,749.88$0.67$6,213.58
2582.5034" BROKEN LINE MULTI COMP GR IN (WR)L F976$0.65$634.40$0.62$605.12$0.67$653.92
2582.5036" SOLID LINE MULTI COMP GR IN (WR)L F9,128$0.86$7,850.08$0.82$7,484.96$0.92$8,397.76
2582.50324" SOLID LINE MULTI COMP GR IN (WR)L F570$14.70$8,379.00$14.00$7,980.00$17.60$10,032.00
2582.518CROSSWALK MULTI COMPS F216$13.65$2,948.40$13.00$2,808.00$6.60$1,425.60
2582.518PAVT MSSG MULTI COMPS F894$14.15$12,650.10$13.50$12,069.00$9.20$8,224.80
2582.518CROSSWALK MULTI COMP GR IN (WR)S F216$17.35$3,747.60$16.50$3,564.00$11.00$2,376.00
2582.518PAVT MSSG MULTI COMP GR IN (WR)S F894$20.50$18,327.00$19.50$17,433.00$16.50$14,751.00
 Totals for project 1808 $158,040.62 $162,534.59 $156,043.48
 
1503 - SAP 009-607-025 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGSKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$16,500.00$16,500.00$2,000.00$2,000.00$2,000.00$2,000.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL2,563$1.75$4,485.25$2.19$5,612.97$2.50$6,407.50
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD21,354$0.70$14,947.80$0.75$16,015.50$1.03$21,994.62
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON7,096$2.75$19,514.00$3.64$25,829.44$2.69$19,088.24
2563.601TRAFFIC CONTROL SUPERVISORLS1$390.00$390.00$750.00$750.00$1,000.00$1,000.00
2563.601TRAFFIC CONTROLLS1$1,050.00$1,050.00$1,500.00$1,500.00$1,500.00$1,500.00
2580.503INTERIM PAVEMENT MARKINGL F12,910$0.09$1,161.90$0.14$1,807.40$0.12$1,549.20
2582.5034" SOLID LINE MULTI COMPL F6,062$0.28$1,697.36$0.27$1,636.74$0.27$1,636.74
2582.5034" BROKEN LINE MULTI COMPL F393$0.28$110.04$0.27$106.11$0.27$106.11
2582.5036" SOLID LINE MULTI COMPL F8,928$0.38$3,392.64$0.36$3,214.08$0.36$3,214.08
2582.50324" SOLID LINE MULTI COMPL F119$10.00$1,190.00$9.50$1,130.50$8.20$975.80
2582.5034" SOLID LINE MULTI COMP GR IN (WR)L F6,062$0.65$3,940.30$0.62$3,758.44$0.67$4,061.54
2582.5036" SOLID LINE MULTI COMP GR IN (WR)L F8,928$0.86$7,678.08$0.82$7,320.96$0.92$8,213.76
2582.5034" BROKEN LINE MULTI COMP GR IN (WR)L F393$0.65$255.45$0.62$243.66$0.67$263.31
2582.50324" SOLID LINE MULTI COMP GR IN (WR)L F119$15.00$1,785.00$14.00$1,666.00$17.60$2,094.40
 Totals for project 1503 $78,097.82 $72,591.80 $74,105.30
 
1807 - SAP 009-620-009 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGSKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$1,100.00$1,100.00$2,000.00$2,000.00$1,000.00$1,000.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL817$1.70$1,388.90$2.19$1,789.23$2.50$2,042.50
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD6,810$1.05$7,150.50$0.75$5,107.50$1.03$7,014.30
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON2,278$2.75$6,264.50$3.64$8,291.92$2.69$6,127.82
2563.601TRAFFIC CONTROL SUPERVISORLS1$400.00$400.00$750.00$750.00$1,000.00$1,000.00
2563.601TRAFFIC CONTROLLS1$840.00$840.00$1,100.00$1,100.00$1,000.00$1,000.00
2580.503INTERIM PAVEMENT MARKINGL F2,678$0.15$401.70$0.14$374.92$0.12$321.36
2582.5034" SOLID LINE MULTI COMPL F801$0.28$224.28$0.27$216.27$0.27$216.27
2582.5034" BROKEN LINE MULTI COMPL F538$0.28$150.64$0.27$145.26$0.27$145.26
2582.5034" SOLID LINE MULTI COMP GR IN (WR)L F801$0.65$520.65$0.62$496.62$0.67$536.67
2582.5034" BROKEN LINE MULTI COMP GR IN (WR)L F538$0.65$349.70$0.62$333.56$0.67$360.46
 Totals for project 1807 $18,790.87 $20,605.28 $19,764.64
 
1506 - SAP 009-622-006 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGSKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$1,100.00$1,100.00$2,000.00$2,000.00$12,000.00$12,000.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL16,037$1.70$27,262.90$2.19$35,121.03$2.50$40,092.50
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD133,642$0.85$113,595.70$0.75$100,231.50$1.03$137,651.26
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON44,659$2.75$122,812.25$3.64$162,558.76$2.68$119,686.12
2563.601TRAFFIC CONTROL SUPERVISORLS1$400.00$400.00$750.00$750.00$1,000.00$1,000.00
2563.601TRAFFIC CONTROLLS1$1,680.00$1,680.00$2,300.00$2,300.00$2,000.00$2,000.00
2580.503INTERIM PAVEMENT MARKINGL F103,812$0.09$9,343.08$0.14$14,533.68$0.12$12,457.44
2582.5034" SOLID LINE MULTI COMPL F44,483$0.28$12,455.24$0.27$12,010.41$0.27$12,010.41
2582.5034" BROKEN LINE MULTI COMPL F7,423$0.28$2,078.44$0.27$2,004.21$0.27$2,004.21
2582.5036" SOLID LINE MULTI COMPL F100,232$0.38$38,088.16$0.36$36,083.52$0.36$36,083.52
2582.5034" SOLID LINE MULTI COMP GR IN (WR)L F44,483$0.65$28,913.95$0.62$27,579.46$0.67$29,803.61
2582.5034" BROKEN LINE MULTI COMP GR IN (WR)L F7,423$0.65$4,824.95$0.62$4,602.26$0.67$4,973.41
2582.5036" SOLID LINE MULTI COMP GR IN (WR)L F100,232$0.86$86,199.52$0.82$82,190.24$0.92$92,213.44
 Totals for project 1506 $448,754.19 $481,965.07 $501,975.92
 
1809 - SAP 009-661-029 BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGSKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS0.71$4,200.00$2,982.00$2,000.00$1,420.00$2,300.00$1,633.00
2021.501MOBILIZATIONLS0.29$4,200.00$1,218.00$2,000.00$580.00$2,300.00$667.00
2232.603MILLED RUMBLE STRIPSL F430$15.75$6,772.50$27.90$11,997.00$38.00$16,340.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL1,911$1.70$3,248.70$2.19$4,185.09$2.50$4,777.50
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL885$1.70$1,504.50$2.19$1,938.15$2.50$2,212.50
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD15,924$0.85$13,535.40$0.75$11,943.00$1.03$16,401.72
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD7,373$0.85$6,267.05$0.75$5,529.75$1.03$7,594.19
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON5,288$2.75$14,542.00$3.64$19,248.32$2.68$14,171.84
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON2,448$2.75$6,732.00$3.64$8,910.72$2.68$6,560.64
2563.601TRAFFIC CONTROL SUPERVISORLS0.71$400.00$284.00$750.00$532.50$1,000.00$710.00
2563.601TRAFFIC CONTROL SUPERVISORLS0.29$400.00$116.00$750.00$217.50$1,000.00$290.00
2563.601TRAFFIC CONTROLLS0.71$840.00$596.40$650.00$461.50$1,000.00$710.00
2563.601TRAFFIC CONTROLLS0.29$840.00$243.60$650.00$188.50$1,000.00$290.00
2580.503INTERIM PAVEMENT MARKINGL F8,738$0.09$786.42$0.14$1,223.32$0.12$1,048.56
2580.503INTERIM PAVEMENT MARKINGL F7,442$0.09$669.78$0.14$1,041.88$0.12$893.04
2582.5034" SOLID LINE MULTI COMPL F3,956$0.28$1,107.68$0.27$1,068.12$0.27$1,068.12
2582.5034" SOLID LINE MULTI COMPL F3,123$0.28$874.44$0.27$843.21$0.27$843.21
2582.5034" BROKEN LINE MULTI COMPL F413$0.28$115.64$0.27$111.51$0.27$111.51
2582.5036" SOLID LINE MULTI COMPL F6,016$0.38$2,286.08$0.36$2,165.76$0.36$2,165.76
2582.5036" SOLID LINE MULTI COMPL F2,735$0.38$1,039.30$0.36$984.60$0.36$984.60
2582.5036" DOTTED LINE MULTI COMPLF39$0.38$14.82$0.36$14.04$0.36$14.04
2582.5034" SOLID LINE MULTI COMP GR IN (WR)L F3,956$0.65$2,571.40$0.62$2,452.72$0.67$2,650.52
2582.5034" SOLID LINE MULTI COMP GR IN (WR)L F3,123$0.65$2,029.95$0.62$1,936.26$0.67$2,092.41
2582.5034" BROKEN LINE MULTI COMP GR IN (WR)L F413$0.65$268.45$0.62$256.06$0.67$276.71
2582.5036" SOLID LINE MULTI COMP GR IN (WR)L F6,016$0.86$5,173.76$0.82$4,933.12$0.92$5,534.72
2582.5036" SOLID LINE MULTI COMP GR IN (WR)L F2,735$0.86$2,352.10$0.82$2,242.70$0.92$2,516.20
2582.5036" DOTTED LINE MULTI COMP GR IN (WR)L F39$0.86$33.54$0.82$31.98$0.92$35.88
 Totals for project 1809 $77,365.51 $86,457.31 $92,593.67
 
1911 - T.L.T. 2019-01 EAST CHUB LK RD BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGSKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$1,100.00$1,100.00$2,000.00$2,000.00$3,100.00$3,100.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL3,884$1.85$7,185.40$2.19$8,505.96$2.50$9,710.00
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD32,369$0.65$21,039.85$0.75$24,276.75$1.03$33,340.07
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON10,822$2.70$29,219.40$3.64$39,392.08$2.68$29,002.96
2563.601TRAFFIC CONTROL SUPERVISORLS1$400.00$400.00$750.00$750.00$1,000.00$1,000.00
2563.601TRAFFIC CONTROLLS1$525.00$525.00$1,200.00$1,200.00$1,000.00$1,000.00
2580.503INTERIM PAVEMENT MARKINGL F47,096$0.09$4,238.64$0.14$6,593.44$0.12$5,651.52
2582.5034" SOLID LINE MULTI COMPL F23,196$0.28$6,494.88$0.27$6,262.92$0.27$6,262.92
2582.5034" BROKEN LINE MULTI COMPL F352$0.28$98.56$0.27$95.04$0.27$95.04
2582.5036" SOLID LINE MULTI COMPL F25,288$0.38$9,609.44$0.36$9,103.68$0.36$9,103.68
2582.5034" SOLID LINE MULTI COMP GR IN (WR)L F23,196$0.65$15,077.40$0.62$14,381.52$0.67$15,541.32
2582.5034" BROKEN LINE MULTI COMP GR IN (WR)L F352$0.65$228.80$0.62$218.24$0.67$235.84
2582.5036" SOLID LINE MULTI COMP GR IN (WR)L F25,288$0.86$21,747.68$0.82$20,736.16$0.92$23,264.96
 Totals for project 1911 $116,965.05 $133,515.79 $137,308.31
 
1912 - T.L.T. 2019-02 JAY WEST RD BITUMINOUS SEAL COAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGSKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$1,100.00$1,100.00$2,000.00$2,000.00$2,400.00$2,400.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL2,813$1.70$4,782.10$2.19$6,160.47$2.50$7,032.50
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD23,442$0.84$19,691.28$0.75$17,581.50$1.03$24,145.26
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON7,842$2.75$21,565.50$3.64$28,544.88$2.68$21,016.56
2563.601TRAFFIC CONTROL SUPERVISORLS1$400.00$400.00$750.00$750.00$1,000.00$1,000.00
2563.601TRAFFIC CONTROLLS1$525.00$525.00$900.00$900.00$1,000.00$1,000.00
2580.503INTERIM PAVEMENT MARKINGL F25,662$0.09$2,309.58$0.14$3,592.68$0.12$3,079.44
2582.5034" SOLID LINE MULTI COMPL F11,641$0.28$3,259.48$0.27$3,143.07$0.27$3,143.07
2582.5036" SOLID LINE MULTI COMPL F19,180$0.38$7,288.40$0.36$6,904.80$0.36$6,904.80
2582.5034" BROKEN LINE MULTI COMPL F1,190$0.28$333.20$0.27$321.30$0.27$321.30
2582.5034" SOLID LINE MULTI COMP GR IN (WR)L F11,641$0.65$7,566.65$0.62$7,217.42$0.67$7,799.47
2582.5036" SOLID LINE MULTI COMP GR IN (WR)L F19,180$0.86$16,494.80$0.82$15,727.60$0.36$6,904.80
2582.5034" BROKEN LINE MULTI COMP GR IN (WR)L F1,190$0.65$773.50$0.62$737.80$0.67$797.30
 Totals for project 1912 $86,089.49 $93,581.52 $85,544.50
 
1913 - T.L.T. 2019-03 WEST CHUB LK RD BITUM SEALCOAT/SCRUB SEAL/FOG SEALKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$1,100.00$1,100.00$2,000.00$2,000.00$3,100.00$3,100.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL4,065$1.80$7,317.00$2.19$8,902.35$2.50$10,162.50
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD33,873$0.84$28,453.32$0.75$25,404.75$1.03$34,889.19
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON11,332$2.70$30,596.40$3.64$41,248.48$2.68$30,369.76
2563.601TRAFFIC CONTROL SUPERVISORLS1$400.00$400.00$750.00$750.00$1,000.00$1,000.00
2563.601TRAFFIC CONTROLLS1$105.00$105.00$800.00$800.00$1,000.00$1,000.00
2580.503INTERIM PAVEMENT MARKINGL F48,420$0.09$4,357.80$0.14$6,778.80$0.12$5,810.40
2582.5034" SOLID LINE MULTI COMPL F23,557$0.28$6,595.96$0.27$6,360.39$0.27$6,360.39
2582.5036" SOLID LINE MULTI COMPL F27,714$0.38$10,531.32$0.36$9,977.04$0.36$9,977.04
2582.5034" BROKEN LINE MULTI COMPL F653$0.28$182.84$0.27$176.31$0.27$176.31
2582.5034" SOLID LINE MULTI COMP GR IN (WR)L F23,557$0.65$15,312.05$0.62$14,605.34$0.67$15,783.19
2582.5036" SOLID LINE MULTI COMP GR IN (WR)L F27,714$0.86$23,834.04$0.82$22,725.48$0.92$25,496.88
2582.5034" BROKEN LINE MULTI COMP GR IN (WR)L F653$0.65$424.45$0.62$404.86$0.92$600.76
 Totals for project 1913 $129,210.18 $140,133.80 $144,726.42
 
1914 - CITY OF CARLTON 2019-01 4TH ST/SCHOOL AVE BITUMINOUS SEALCOAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGSKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$1,100.00$1,100.00$2,000.00$2,000.00$1,000.00$1,000.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL516$1.75$903.00$2.19$1,130.04$2.50$1,290.00
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD4,296$1.00$4,296.00$0.75$3,222.00$1.03$4,424.88
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON1,433$2.75$3,940.75$3.64$5,216.12$2.68$3,840.44
2563.601TRAFFIC CONTROL SUPERVISORLS1$400.00$400.00$750.00$750.00$500.00$500.00
2563.601TRAFFIC CONTROLLS1$840.00$840.00$550.00$550.00$750.00$750.00
 Totals for project 1914 $11,479.75 $12,868.16 $11,805.32
 
1915 - CITY OF CARLTON 2019-02 5TH ST BITUMINOUS SEALCOAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGSKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$1,100.00$1,100.00$2,000.00$2,000.00$1,000.00$1,000.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL88$2.00$176.00$2.19$192.72$2.50$220.00
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD733$1.75$1,282.75$0.75$549.75$1.03$754.99
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON246$3.00$738.00$3.64$895.44$2.68$659.28
2563.601TRAFFIC CONTROL SUPERVISORLS1$500.00$500.00$750.00$750.00$500.00$500.00
2563.601TRAFFIC CONTROLLS1$840.00$840.00$200.00$200.00$750.00$750.00
 Totals for project 1915 $4,636.75 $4,587.91 $3,884.27
 
1916 - CITY OF CARLTON 2019-03 ALMAR DR BITUMINOUS SEALCOAT/SCRUB SEAL/FOG SEAL, PAVEMENT MARKINGSKGM CONTRACTORS INC Scott Construction, Inc. Asphalt Surface Technologies Corp. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$1,100.00$1,100.00$2,000.00$2,000.00$1,000.00$1,000.00
2355.506BITUMINOUS MATERIAL FOR FOG SEALGAL83$2.00$166.00$2.19$181.77$2.50$207.50
2356.604BITUMINOUS SEAL COAT - SCRUB SEALSQ YD693$3.20$2,217.60$0.75$519.75$1.03$713.79
2356.606BITUMINOUS MATERIAL FOR SCRUB SEALGALLON232$2.75$638.00$3.64$844.48$2.68$621.76
2563.601TRAFFIC CONTROL SUPERVISORLS1$400.00$400.00$750.00$750.00$500.00$500.00
2563.601TRAFFIC CONTROLLS1$840.00$840.00$200.00$200.00$750.00$750.00
 Totals for project 1916 $5,361.60 $4,496.00 $3,793.05
 
Contract Total:$1,171,717.75$1,252,760.57$1,271,439.69