CARLTON COUNTY, MN

County Projects

CLOSING DATE Monday, April 9, 2018

 

 

ADVERTISEMENT FOR BIDS

NOTICE IS GIVEN THAT BIDS WILL BE RECEIVED UNTIL 10:00 AM CST on Monday, April 9, 2018, ELECTRONICALLY AT bidVAULT at https://bidvault.mn.uccs.com FOR THE PROJECT(S) LISTED BELOW.

 

PROJECT NOs. CP 009-123-008, CP 009-140-006, CP 1802, SAP 009-602-023, SAP 009-603-035, SAP 009-608-019

  

CP 009-123-008, County Project No. CP 009-123-008
On CR 123 (Eagle Lake Rd) between T-101 and TH 73; length: 1.889 Mi
 
CP 009-140-006, County Project No. CP 009-140-006
On CR 140 between CSAH 6 in Barnum and CSAH 61; length: 2.04 Miles
 
CP 1802, County Project No. CP 1802
1950 Hwy 210, Carlton, MN; length: 527 Ft
 
SAP 009-602-023, County Project No. 1731
On CSAH 2 (North Cloquet Rd) between TH 33 and CR 119 (Crosby Rd) in Cloquet, MN.; length: 1.85 Miles
 
SAP 009-603-035, County Project No. 1718
On CSAH 3 between TH 45 in Carlton and CSAH 26 (Moorhead Rd) in Cloquet; length: 1.46 Miles
 
SAP 009-608-019, County Project No. 1504
On CSAH 8 between CR 145 in Holyoke and McDowell Rd; length: 3.42 Miles
 
The Major items of work are:
1,348.00 S Y of REMOVE BITUMINOUS PAVEMENT
2,232.00 S F of REMOVE BITUMINOUS PAVEMENT
1,351.00 C Y of SUBGRADE EXCAVATION
264.00 RDST of SUBGRADE PREPARATION
1,886.00 S Y of SUBGRADE PREPARATION
6,634.00 TON of AGGREGATE SURFACING CLASS 1
365.00 TON of AGGREGATE SURFACING CLASS 5
3,095.00 TON of AGGREGATE BASE CLASS 5
35,794.00 S Y of FULL DEPTH RECLAMATION
22,677.00 S Y of STABILIZED FULL DEPTH RECLAMATION
274.00 TON of BITUMINOUS MATERIAL FOR MIXTURE
35,707.00 S Y of MILL BITUMINOUS SURFACE (1.0")
42,505.00 S Y of MILL BITUMINOUS SURFACE (2.0")
21,076.00 S Y of MILL BITUMINOUS SURFACE (4.0")
33,802.00 TON of TYPE SP 12.5 WEARING COURSE MIX (2;C)
7.00 EACH of ADJUST FRAME & RING CASTING
192.00 S F of 6" CONCRETE WALK
345.50 S F of SIGN PANELS TYPE C
982.00 S Y of RAPID STABILIZATION METHOD 4
73,290.00 L F of INTERIM PAVEMENT MARKING
49,087.00 L F of 4" SOLID LINE MULTI COMP GR IN (WR)
102,333.00 L F of 6" SOLID LINE MULTI COMP GR IN (WR)

 

ONLY REGISTERED PLAN HOLDERS WILL BE ALLOWED TO BID.  To become a plan holder go to the Department's eGram website at https://egram.co.carlton.mn.us Bidders must login or create an account, select the appropriate projects in the 'Projects in Bidding' list. Click "Become a plan holder" under the head "Plan Holder Data".  You will need to download files in order to view them.  Bid documents for tied projects are combined into one set of plans and one proposal.

TO BID ON THE PROJECT, go to the project homepage in egram and click "View this contract on bidVAULT" under the head "bidVAULT".  This will redirect you to the bidVAULT site.  Click "Bid on this project" under the header "Project Information".  There is a $25.00 fee to bid on the project.

Electronic Bids must be accompanied by a corporate surety bond in an amount which is at least equal to 5% of the total bid, and may be submitted electronically through bidVAULT using Surety 2000 or InSure Vision Technologies, LLC, or as a hard copy by mail or other delivery method, either as a corporate surety bond or a certified check made payable to the Auditor/Treasurer of Carlton County. If not submitted electronically, the proposal guarantee must be received at the Carlton County Transportation Department, 1630 Co Rd 61, Carlton, MN 55718, in a sealed envelope marked clearly with the name of the bidder, type of work, and project number by 4:00 p.m. CST, the business day prior to the specified date of bid opening.

The County reserves the right to reject any or all bids and to waive any irregularities thereof.

JinYeene M. Neumann, P.E.
County Engineer