1417 CP 009-696-002 CP 009-696-002 Minor Grading, Core Cuts, Culv.... On CR 696 (St Louis River Rd)...  04/27/2020
1511 CP 009-114-009 CP 009-114-009 SEALCOAT On C.R. 114 (Trettel Ln) from CSAH...  01/13/2020
1602 SAP 009-601-051 SAP 009-601-051Esko Bridge On CSAH 1 over the Midway River,...  11/25/2019
1705 CP 009-103-008 CP 009-103-008 by Bridge 4277 Grant Funded CR 103 at Skunk Creek, N & S of Br...  01/07/2019
1715 SAP 009-616-004 009-616-004 (Washington Ave) - Storm, Sanitary, Water... On CSAH 16 (Washington Ave) from...  04/22/2019
1716 CP 009-151-004 009-151-004 Jay Cooke Road Bitum Surf   02/24/2020
1720 SAP 009-651-003 SAP 009-651-003 Alcohol Road Bitum Surf   02/24/2020
1724 SAP 009-599-028 SAP 009-599-028 N HOLYOKE DR - BOX CULVERT REPLACEMENT Box culvert replacement on N....  04/27/2020
1817 SAP 009-627-001 SAP 009-627-001 On CSAH 27 (Erickson Rd) from CSAH...  02/24/2020
1819 SAP 009-604-039 SAP 009-604-039 Seal Coat & Ground In Pavement Marking On CSAH 4 between TH 73 and I-35;...  01/13/2020
1827 SAP 009-601-055 SAP 009-601-055 Bituminous Mill & Overlay TH 210 to BR... On CSAH 1 (Dalles Ave.) in Thompson  02/24/2020
1902 SAP 009-611-004 SAP 009-611-004, Br 09534 On CSAH 11 over Nemadji Creek 0.8...  06/24/2019
1904 SP 009-608-032 009-608-032 CR 8 EAST OF HOLYOKE 1.5 miles east of Holyoke  06/09/2020
1906 SP 009-608-034 SP 009-608-034 CR 8 CULVERT NEAR WI LINE   06/17/2020
1907 SP 009-608-039 SP 009-608-039 CR 8 REPLACE BRIDGE 93187 .25 miles west of Wisconsin State...  06/17/2020
1910 SP 009-608-038 SP 009-608-038 CR 8 1000' S OF McDOWELL RD Wild Cat Canyon  06/09/2020
1914 City of Carlton 2019-01 City of Carlton 2019-01 On School Ave. from TH 210 to 6th...  01/13/2020
1915 City of Carlton 2019-02 City of Carlton 2019-02 On 5th St. from TH 210 to School...  01/13/2020
1916 City of Carlton 2019-03 City of Carlton 2019-03 On Almar Drive from School Ave. to...  01/13/2020
1918 SB 2020-01 SILVER BROOK TWP 2020-01 ABLEITER RD On Ableiter Rd from CSAH 18 to...  02/24/2020

Construction Status

1016 Roadwork: SAP 009-621-003 Bituminous Mill, Grading, Aggregate Base - On CSAH 21 (Swede Lake Rd) between 1.8 miles N of CR 123 and TH 210 in Cromwell, MN Estimated End Date: 09/27/2019
6/5/2020: Construction for this project is complete.
1417 Roadwork: CP 009-696-002 Minor Grading, Core Cuts, Culv. Replacements, Bit Surfacing, Aggr. Shoulders, Pvmnt Markings - On CR 696 (St Louis River Rd) between TH 33 and CSAH 1 Estimated End Date: 10/09/2020
Paving and road work done for 2020 season. Paving gravel area one mile west of CSAH 1 will be done summer 2021. RAN
1504 Roadwork: SAP 009-608-019 Bituminous Surface, Aggregate Shoulders, Pavement Markings - On CSAH 8 between CR 145 in Holyoke and McDowell Rd Estimated End Date: 10/29/2018
All controlling operations are complete as of 5/20/20. - Ron 6/4/20
1511 Roadwork: CP 009-114-009 SEALCOAT - On C.R. 114 (Trettel Ln) from CSAH 115 (Airport Rd) to CSAH 7; length: 0.494 Miles Estimated End Date: 08/27/2021
Scrub seal complete, signs installed, waiting on temp. striping. RAN 8/28/2020
1602 Roadwork: SAP 009-601-051Esko Bridge - On CSAH 1 over the Midway River, 0.3 Miles North of the Junction with CSAH 61 Estimated End Date: 06/25/2021
Road is open to traffic, work on the project is complete for the season. October 2020
1705 Roadwork: CP 009-103-008 by Bridge 4277 Grant Funded - CR 103 at Skunk Creek, N & S of Br 09532, Section 35 T47N R17W Estimated End Date: 
Project is complete.
1715 Roadwork: 009-616-004 (Washington Ave) - Storm, Sanitary, Water utility improvements, Curb & Gutter, ADA Pedestrian Ramps, Sidewalk, Shared-use Path, Bituminous, Landscape Trees, Sign Panels - On CSAH 16 (Washington Ave) from TH 33 in the City of Cloquet, MN to CSAH 45 in the City of Scanlon, MN. Estimated End Date: 09/20/2019
Project is Complete.
1716 Roadwork: 009-151-004 Jay Cooke Road Bitum Surf Estimated End Date: 10/09/2020
Construction Project is Complete. October 2020
1720 Roadwork: SAP 009-651-003 Alcohol Road Bitum Surf Estimated End Date: 10/09/2020
Construction project is complete. August 2020
1724 Roadwork: SAP 009-599-028 N HOLYOKE DR - BOX CULVERT REPLACEMENT - Box culvert replacement on N. Holyoke Dr. 0.4 Mi East of TH 23 Estimated End Date: 10/09/2020
August 12, 2020 Road is open and project is substantially complete
1817 Roadwork: SAP 009-627-001 - On CSAH 27 (Erickson Rd) from CSAH 61 to CSAH 2 Estimated End Date: 10/09/2020
Project is complete. August 18 2020
1819 Roadwork: SAP 009-604-039 Seal Coat & Ground In Pavement Marking - On CSAH 4 between TH 73 and I-35; length: 15.502 Miles Estimated End Date: 08/27/2021
Scrub seal complete. Temporary striping week of Nov. 2, 2020. Final striping will be done summer 2021.
1827 Roadwork: SAP 009-601-055 Bituminous Mill & Overlay TH 210 to BR 09504 - On CSAH 1 (Dalles Ave.) in Thompson Estimated End Date: 10/09/2020
Project is Complete.
1902 Roadwork: SAP 009-611-004, Br 09534 - On CSAH 11 over Nemadji Creek 0.8 miles N of CSAH 8 Estimated End Date: 06/19/2020
Project is complete. RAN
1904 Roadwork: 009-608-032 CR 8 EAST OF HOLYOKE - 1.5 miles east of Holyoke Estimated End Date: 10/04/2020
Project has started with clearing and grubbing and excavation. 9/1/2020.
Project is complete for 2020. Punch list items and vegetation growth needed to final project during 2021 construction season. 10/29/2020
1906 Roadwork: SP 009-608-034 CR 8 CULVERT NEAR WI LINE Estimated End Date: 10/20/2022
Project is Complete.
1907 Roadwork: SP 009-608-039 CR 8 REPLACE BRIDGE 93187 - .25 miles west of Wisconsin State line on CSAH 8 Estimated End Date: 10/10/2022
September 21 , 2020. Road is closed to traffic. Deck for new bridge is poured, contractor working on finishing grading.....October 20, 2020 Road is open to traffic. Work is complete for 2020. RAN
1910 Roadwork: SP 009-608-038 CR 8 1000' S OF McDOWELL RD - Wild Cat Canyon Estimated End Date: 09/18/2020
Contractor began Clear and grub operations 8/17/2020. Setting mats. 8/25/2020. Project complete, waiting for vegetation to grow. RAN 9/3/2020
1914 Roadwork: City of Carlton 2019-01 - On School Ave. from TH 210 to 6th Street N.; length: 0.263 Miles Estimated End Date: 08/27/2021
Construction is complete. RAN 9/1/2020
1915 Roadwork: City of Carlton 2019-02 - On 5th St. from TH 210 to School Ave; length: .063 Miles Estimated End Date: 08/27/2021
Construction is complete
1916 Roadwork: City of Carlton 2019-03 - On Almar Drive from School Ave. to 260’ N. of School Ave.; length: .0492 Estimated End Date: 08/27/2021
Construction is complete
1918 Roadwork: SILVER BROOK TWP 2020-01 ABLEITER RD - On Ableiter Rd from CSAH 18 to 0.88 east of CSAH 18 Estimated End Date: 10/09/2020
Construction is complete

Planning Projects

These projects are not yet open for bid and are subject to change
Project ID Project No. Description Construction Location Anticipated Bid Date
1017 (subject to change) SAP 009-621-004 (subject to change) SAP 009-621-004 Bituminous Surface, Aggr Shoulders,... On CSAH 21 (Swede Lake Rd) from CR...  Dec 2019